Exactly How To Pick Cone Crusher Liners

From Boarmumps Academy

The functionality of the liner of the conoid crusher is actually to shield the cylinder body, so that the cylinder body is not straight impacted and also put on by the grinding physical body as well as the component. It can easily likewise utilize its own various functioning surfaces to readjust the functioning state of the grinding body system to enhance the grinding day. The squashing impact of the material improves the grinding performance, improves the outcome, and lessens the loss of the medium as well as the liner.

Cone crusher liner replacement
When the liner of the conoid crusher is not put on to the level that it needs to have to become switched Find Out More, the tooth plate may be reversed, or even the upper and also lower components may be turned around. When the density of the lining of the cone crusher hits 65% to 80%, or even the limited damage is skewed and cracked, it needs to be actually substituted. After putting in the liners, examine whether their centers are actually proper. If the center is not right, crashes will certainly take place throughout rotation, as well as the fragment dimension of the product will be actually irregular, which will definitely cause malfunctions including heating of the abrasion parts in the device.

The liner of the cone crusher used to make use of higher manganese steel and also modified high manganese steel, carbon composite steel and chromium directed iron. Right now so as to boost the service life of the lining, Hysan generally utilizes manganese steel with a manganese content of much more than thirteen%. Under a tough impact lots, it constitutes hardening and also wear-resistant toughness on its own area.

Cone crusher liner-installation method
( 1) Put solidified carbon dioxide into the interior opening of the bushing to become put in to lower the chilly size of the bushing. A small amount of filler can be contributed to the bushing to help make the solidified carbon dioxide completely contact the bushing.
( 2) After packing the solidified carbon dioxide, cover the bushing and the dry ice inside with canvas to stop frosting on the exterior area of the bushing.
( 3) The cooling time is actually two hours. The approach of assessing the diameter of the bushing can be made use of to establish whether it has actually been adequately cooled.
( 4) If it is calculated that the bushing is sufficiently cooled, it ought to be rapidly installed in to the internal opening of the frame. After being actually put up in location, the higher area of the framework bushing ought to be actually flush with the upper surface area of the inner gap of the framework. If there are actually troubles in the assembly procedure, a wood hammer may be made use of to knock the higher area of the bushing gradually and also uniformly until the whole entire bushing remains in place.
( 5) After the liner is in area, molten zinc alloy filler is actually commonly used to deal with the lining.